Find a stockist
Preparation & installation

A beautiful result
begins before installation.

Six steps to prepare your project with care. Use this guide alongside the confirmed instructions for your panel, adhesive system and substrate.

Cutting a panel to size — Habitat-One installation image
Panel layout and detailing.
Applying adhesive — Habitat-One installation image
Adhesive and preparation.
01

Check the panel and substrate.

Record the product code, colour and size. Check the delivery and assess the substrate for load-bearing capacity, flatness, adhesion and moisture. Have the intended application and adhesive system confirmed before you begin.

02

Create a layout plan.

Choose the texture direction and arrange the panels across the entire surface. Plan joints, corners, openings and cut pieces. Compare colour and pattern in the light of the finished space.

03

Plan cutting and curves.

Ask for the appropriate cutting method for the selected panel. For curved surfaces, have the permitted radius and bending direction confirmed. Make a trial detail first; do not force the panel.

04

Install according to the selected system.

Follow the confirmed instructions from the panel and adhesive suppliers. The general material sheet specifies acrylic adhesive or equivalent, but provides no complete installation instructions. Also request the installation temperature, open time and curing time.

05

Finish edges, joints and junctions.

Follow the details agreed in advance. Coordinate joints, edges and junctions with the expected loads and possible substrate movement. Wet areas and exterior façades require assessment of the complete build-up.

06

Protect and inspect the finish.

Keep adhesive off the visible surface and protect it during adjacent work. Use only a confirmed cleaning method. Keep product codes and installation and maintenance instructions with the project records.

Bring it into your project

The preparation.
On one checklist.

A checklist for discussions with your installer or stockist.

Download the installation checklist

PDF · English · General project checklist. This guide does not replace product-specific installation instructions.

Further reading from the manufacturer.

The general installation guide covers joint planning, even adhesive application and pressing the panels into place. The accompanying guidance emphasises clean hands and protection from adhesive, cement and paint. Confirm the instructions for your article code and application.

Manufacturer’s installation guide · English
Manufacturer’s application guidance · English
Warm light on a sand-coloured wall — inspiration image
From image to experience

Experience the material
up close.

Find a stockist for information about the collection and the possibilities for your project. Check each location for available panels and displays.

Find a stockist
Habitat-One · Jávea / Xàbia, Spain · Showroom available
Visualisation / inspiration